SCADA Check: your Ignition or WinCC project reviewed in 3 working days, fixed price €1,950
The SIM Solutions SCADA Check is a fixed-price review of one SCADA project on Inductive Automation Ignition or Siemens WinCC. Our team of experienced SCADA engineers goes through the complete project: tags, alarms, scripts, historian, screens, security and performance. Within 3 working days (72 hours) you get a written report with the findings, the risks, the priorities and how to fix each point. The price is €1,950 excl. VAT. Nothing is touched on site. SIM Solutions BV is an OT and E&I engineering company in Mechelen, Belgium, working for industrial clients since 2017.
Key facts
| What | Complete review of one SCADA project (one Ignition gateway or one WinCC project) |
|---|---|
| Platforms | Ignition (Perspective and Vision, 7.9, 8.1, 8.3) and Siemens WinCC (V7, Professional, Unified, WinCC OA and TIA Portal HMI panels) |
| Turnaround | 3 working days (72 hours) after we have your files, all passwords and the order payment |
| Price | €1,950 excl. VAT, fixed |
| Payment | €250 when you order (non-refundable), €1,700 with the report |
| Deduction | Order the fix from us within 30 days of the report and the €1,950 is deducted from that invoice |
| You provide | Complete project backup and all passwords (gateway, project, user administration) |
| On site | Nothing. We work on a copy of your project |
| Report | Findings, risks, priorities and how to fix each point |
| Languages | English, Dutch, French |
| Where | Belgium, the Netherlands and northern France, and the rest of Europe |
When a SCADA Check makes sense
Typical situations where a check pays off:
- Alarm floods. Operators get so many alarms that the important ones are missed.
- Slow or unstable system. Screens load slowly, the gateway or server runs at high load, or clients disconnect.
- The integrator is gone. Nobody in the plant fully understands how the project is built.
- Before an upgrade or migration. You plan to move to a new Ignition or WinCC version, or from WinCC to Ignition, and want to know what you are moving.
- Before a takeover or FAT. You want an independent second opinion before you accept a new system.
- Security concerns. Default passwords, shared accounts or open connections that nobody has looked at.
What we check
Our team of experienced SCADA engineers goes through the complete project. Depending on the platform, the review covers:
- Tags and data model: UDTs and faceplates, addressing, tags without a source, duplicate or unused tags, scan classes and tag groups.
- Alarms: configuration, priorities, alarms that can never trigger, alarm floods, chattering alarms, missing shelving or acknowledgement rules.
- Scripts: errors, blocking or slow scripts, scripts that write directly to the PLC, timer and tag-change scripts that load the system.
- Historian and archiving: what is logged, logging rates, storage and retention, gaps in the data.
- Screens and navigation: broken references, inconsistent symbols and colours, screens that are hard to use for the operator.
- Security: users and roles, default or shared passwords, gateway and server settings, certificates and OPC UA security.
- Communication: device and PLC connections, drivers, unused or failing connections, redundancy.
- Performance: gateway or server load, client load, database queries.
- Versions and support: software and module versions, end of support, patch level, backups.
- Maintainability: naming, structure and how easy it will be for your own team or a new supplier to work on it.
What we do not do in a SCADA Check: we do not connect to your plant, we do not change your project, and we do not certify cybersecurity. If we see a security risk, we report it with a priority.
SCADA platforms we check
- Inductive Automation Ignition: Ignition 7.9, 8.1 and 8.3, Perspective and Vision, Edge, tag providers, UDTs, alarm pipelines, historian and gateway scripts.
- Siemens WinCC V7: WinCC V7.4, V7.5 and 8.x, graphics, VBS and C scripts, Alarm Logging, Tag Logging, User Administrator.
- Siemens WinCC in TIA Portal: WinCC Professional, WinCC Unified (PC and panels), Comfort Panels and Basic Panels.
- Siemens WinCC OA: on request.
What you get
A written report (PDF) with:
- Summary – what the system does and the overall state of the project, in plain language.
- Findings – each finding with its location in the project (screen, tag, script or alarm).
- Risks – what can happen in operation if the finding is not fixed.
- Priorities – what to fix first (for example: fix now, fix at the next stop, improve later).
- How to fix – for each point, what needs to change.
If you want us to make the fixes, we quote them separately. Order the fix within 30 days of the report and the €1,950 of the check is deducted from that invoice.
How it works
- Order. Send us a short note on the system and what bothers you. We send the order confirmation and, if you want, our NDA. You pay €250 (non-refundable).
- Send your files. For Ignition a gateway backup (.gwbk) or project export with tag export. For WinCC V7 a packed project (Project Duplicator), for TIA Portal a project archive. Include all passwords.
- We check. Our team of experienced SCADA engineers goes through the complete project on our own test system. Nothing is touched on site.
- Report in 3 working days. You receive the written report and the invoice for the remaining €1,700.
- Fix (optional). Order the fix from us within 30 days and the €1,950 is deducted from the fix invoice.
Conditions and what we need from you
- The complete project: an Ignition gateway backup (.gwbk) or project and tag export, a packed WinCC V7 project, or a TIA Portal project archive. Tell us the software version and installed modules or options.
- All passwords: gateway admin, project protection, WinCC User Administrator, and any protected scripts or faceplates. Anything we cannot open is listed in the report as not checked.
- If possible: the alarm and event history export of a recent period and a short description of the plant. This helps with alarm floods and performance findings.
- One check = one SCADA project. That is one Ignition gateway, or one WinCC server or station project. Larger systems with several servers or gateways: ask us for a combined price before you order.
- The 3 working days start when we have the complete files, all passwords and the €250 order payment. Missing files or passwords put the clock on hold until we have them.
- Payment: €250 at order (non-refundable), €1,700 with the report. The full €1,950 is deducted from the fix invoice if you order the fix from us within 30 days of the report.
- Not included: connecting to your plant, changing your project, on-site work and cybersecurity certification.
- Confidentiality: NDA on request. Your files and passwords are used only for your check and deleted after the job on request.
Price
€1,950 excl. VAT, fixed price, for one SCADA project.
- €250 when you order (non-refundable).
- €1,700 when you receive the report.
- If you order the fix from us within 30 days of the report, the €1,950 is deducted from that invoice.
Frequently asked questions
How do I check my SCADA project for problems?
Start with the diagnostics your platform gives you: in Ignition the gateway status pages, the logs and the alarm journal; in WinCC the diagnostics, the alarm and tag logging and the cross-reference list. Look for alarm floods, scripts with errors, tags without a source and connections that fail. If you want an independent check, the SIM Solutions SCADA Check does this for you: our team of experienced SCADA engineers reviews the complete project and gives you a written report in 3 working days for a fixed €1,950 excl. VAT.
Which SCADA platforms do you check?
Inductive Automation Ignition (7.9, 8.1 and 8.3, Perspective and Vision) and Siemens WinCC (V7, WinCC Professional, WinCC Unified and TIA Portal HMI panels). WinCC OA on request.
How much does a SCADA review cost?
A fixed €1,950 excl. VAT for one SCADA project: €250 when you order (non-refundable) and €1,700 with the report. If you order the fix from us within 30 days of the report, the €1,950 is deducted from that invoice.
How long does it take?
You get the written report within 3 working days (72 hours). The time starts when we have your project files, all passwords and the €250 order payment.
Do you need access to our plant or our SCADA server?
No. We work on a copy of your project on our own test system. Nothing is touched on site and nobody connects to your network.
What do I need to send?
For Ignition a gateway backup (.gwbk) or project export with tag export. For WinCC V7 a packed project; for WinCC in TIA Portal a project archive. We also need all passwords: gateway admin, project protection and user administration.
Can you help with alarm floods?
Yes. We look at alarm configuration, priorities and, if you send it, the alarm history. The report shows which alarms cause the flood and how to fix them.
Do you also check cybersecurity?
We check users and roles, passwords, gateway and server settings and communication security, and we report risks with a priority. A SCADA Check is not a cybersecurity certification or an IEC 62443 assessment.
Do you also fix the problems you find?
Yes, if you want. We quote the fix separately. If you order the fix within 30 days of the report, the €1,950 of the check is deducted from the fix invoice.
We plan to migrate from WinCC to Ignition. Is a check useful?
Yes. The check shows what is in the existing project, what is unused and what needs attention before you migrate. That makes the migration smaller and easier to price.
Is my project safe with you?
Yes. We sign an NDA on request. Your project and passwords are used only for your check and not shared with anyone else.
How do I order?
Send an email to info@simsolutions.be with a short description of the system and what bothers you. We reply with the order confirmation and, if you want, our NDA.
About SIM Solutions
SIM Solutions BV (enterprise number BE 0680.932.773) is an OT and E&I engineering company in Mechelen, Belgium. Since 2017 we work for industrial clients on PLC programming, SCADA, E&I design and commissioning. SCADA: Ignition and WinCC PLC Program Check
Last updated: 16 November 2026
Order your SCADA Check
Send us a short note about the system and what bothers you. We reply with the order confirmation and, if you want, our NDA.
2800 Mechelen, Belgium E-mail: info@simsolutions.be Enterprise no. / VAT: BE 0680.932.773